Installation Site of Fermentation Tank for Nanjing Organic Fertilizer Production Line: Status Record of White Insulated Warehouse and Material Discharge Port
2026-08-28
2026, installation site of fermentation tank for Nanjing organic fertilizer production line. In the picture, the main body of the large white cylindrical insulated warehouse is completed. The warehouse surface is made of white metal plates, assembled from multiple pieces, and covered with multiple rows of perforated fixing bolts. A feed inlet is located at the top of the warehouse, connected to a steeply inclined belt conveyor. The conveyor's discharge end connects to the warehouse's feed inlet, forming a material entry path.
The warehouse opening faces downwards, and the discharge port is funnel-shaped, connected to a vertical discharge cylinder. Weld marks are visible at the connection between the discharge cylinder and the warehouse. The belt conveyor is located above the warehouse, with a green-painted frame and a red gear drive at the front. The conveyor belt is black. A green foundation support frame is visible at the bottom of the warehouse. The ground is gray cement, with scattered black lines and debris. The workshop has a steel structure roof with lighting tubes, providing good illumination. The equipment is in a state of installation completion and awaiting commissioning.

.jpg)