Your current location: Home > Industry Info
PRODUCTS List+
Industry Info

Installation and precautions of small organic fertilizer production line

2021-03-03
In the fertilizer production equipment installation and maintenance, as long as the mechanical products are required to check and maintain regularly, otherwise it will certainly reduce the life of the machine, and will bring a lot of hidden dangers. So whether it's manufacturing of npk fertilizer or organic fertilizer production, don't be afraid of trouble, and don't be afraid to spend money in maintenance. Don't save trouble now, it will come and go.

The maintenance of the machine is an important and regular work. It should be closely coordinated with its operation and overhaul. There should be full-time personnel on duty for inspection. The details of the installation and maintenance of the organic fertilizer production line equipment are as follows.
small organic fertilizer production line

Installation and test run

1. The equipment of the organic fertilizer production line should be installed on a horizontal concrete foundation and fixed with anchor bolts.
2. Pay attention to the verticality between the main body and the horizontal when installing.
3. After installation, check whether the bolts of each part of the machine are loose and whether the door of the main engine is fastened, if so, please tighten it.
4. Configure the power cord and control switch according to the power of the equipment.
5. After the inspection of the organic fertilizer production line is completed, a no-load test run is carried out, and the test run is normal and production can begin.
Products
Tel
contact
inquiry