Fertilizer Machines Case banner
Your current location: Home > Solution
PRODUCTS List+
Solution

Large wheeled compost turner installation site in Laos: Observation of concrete fermentation tank structure and surrounding forklift and electrical box locations.

2026-08-24
January 11, 2026, Laos. The large wheeled compost turner is installed above a long, narrow concrete fermentation tank. The fermentation tank consists of two concrete walls, approximately 1.5 meters high. The bottom of the tank is gray cement, with forklift tire marks on the surface. Concrete walls on both sides of the equipment serve as support tracks, and a steel ladder is located on the outer side of the left wall for personnel to climb. A control box is fixed above the steel frame on the left, with its door closed. Directly below the main beam, a black spiral cable hangs in mid-air, connecting to the inside of the main beam. Small red parts are scattered on the upper left corner of the ground. On the right side of the image, an orange forklift is in motion or operating, its forks suspended in the air. At the edge of the shed behind the forklift, the bucket of a yellow excavator is visible, indicating that civil engineering or material loading and unloading operations have just been completed. The greenhouse roof is a corrugated steel sheet structure supported by steel pipes. There are water stains on the left side of the floor inside the greenhouse. Two red buckets are placed on the right side of the trough. The site appears to be in an incomplete installation state, with construction vehicles for lifting and moving items nearby.

Products
Tel
contact
inquiry