Your current location: Home > Industry Info
PRODUCTS List+
Industry Info

Installation and maintenance of compound fertilizer granulator machine

2020-01-04
Compound fertilizer granulator machine is an important equipment of NPK fertilizer production line. Its stable working performance can provide a lot of convenience for manufacturers' production. For the maintenance of compound fertilizer production equipment, we have to subdivide to everyone; everyone attaches importance to, So as to guarantee the production of compound fertilizer.
fertilizer granulator machine

First, the maintenance of the fertilizer granulator machine:
1.The shaft of the bearing crusher bears the full load of the negative machine, so good lubrication has a great relationship with the bearing life. It directly affects the service life and operating rate of the machine. Therefore, the injected lubricant must be clean and the seal must be good. ,
The main oil filling point of this machine
(1) Rotary bearings
(2) Roller bearings
(3) All gears
(4) Movable bearings and sliding planes.

2. The newly installed rims are prone to loosening and must be checked frequently.
3. Pay attention to whether the parts of the machine work normally.
4. pay attention to check the wear degree of easy-wearing parts, pay attention to replacing worn parts at any time.
5. The plane of the chassis of the movable device should be removed from dust and other materials to prevent the movable bearing from moving on the chassis when the machine encounters unbreakable materials, resulting in serious accidents.
6. bearing oil temperature rise, should immediately stop the inspection to eliminate the cause.
7. If there is an impact sound when the gear is turned, it should be stopped immediately for inspection and eliminated.

Installation test of fertilizer granulator machine:
1. The equipment should be installed on a horizontal concrete foundation and fixed with anchor bolts.
2. When installing, pay attention to the main body and the vertical.
3. After installation, check whether the bolts in all parts are loose and whether the main engine compartment door is fastened. If so, tighten it.
4. Configure the power cord and control switch according to the power of the device.
5. After the inspection is completed, carry out a no-load test run, and the test run can be carried out normally.
Products
Tel
contact
inquiry